Floors, 7 Holyoke
We’re working on the floors now at the new restaurant. We made the decision to re-use the existing floor which we’re really excited about. For

We’re working on the floors now at the new restaurant. We made the decision to re-use the existing floor which we’re really excited about. For


You can see there the stainless skirt on the walls that we had installed. It has white plastic on it still to protect it. And

Neil, an MIT alum, and Kara invited us to pull the truck up after their wedding this past Saturday. It’s the first time we’ve done

Walls are coming down. Cafco, our contractor, is now in the space. And they are on a very tight 6 week deadline. So things are

If you were by the truck last Friday you might have seen this. It was our first foray into a little idea I’ve had for



The pipes have been re-located and insulated at 7 Holyoke. These were those hot water/ cold water/ glycol pipes that ran right smack through the

Some of you might remember a post earlier about Peter. And those of you who frequent the MIT truck and SWA truck likely know him