Walls down at 7 Holyoke
Walls are coming down. Cafco, our contractor, is now in the space. And they are on a very tight 6 week deadline. So things are

Walls are coming down. Cafco, our contractor, is now in the space. And they are on a very tight 6 week deadline. So things are


The pipes have been re-located and insulated at 7 Holyoke. These were those hot water/ cold water/ glycol pipes that ran right smack through the

We love our A-frames on the sidewalk. They are cheap, easy to use, and effective (at least when my handwriting is legible). But as we

Bathrooms are being built by our land lord, but they only wanted to promise painted walls. My belief is that the only thing that matters

We gave the whiteboard on the side of the truck a new coat of white paint last Friday. But then we wrote up the menu

Those are the bathrooms at 7 Holyoke. They are just the size they need to be, efficient, and (I hope) very clean. I’ve looked at

The countertops for the MIT trucks were sealed with a marine varnish. I was putting coats on at 1:30am each day, after all the day’s

Our landlord is wrapping up their major work. Still a bunch of systems for them to finish (gas, water, chilled/ hot water pipes, fire protection)

So we’ve got power. This is our giant 400 Amp electrical breaker box. In place and ready to go. Can’t wait to put it to