Posts tagged building

From the archives

Pipes insulated at 7 Holyoke

27 September, 2010: The pipes have been re-located and insulated at 7 Holyoke. These were those hot water/ cold water/ glycol pipes that ran right smack through the middle of the space. We’ve been waiting for this for a long time and are excited to see it in place. Can’t say we were thrilled these are in the space in… Read More