![](https://www.cloverfoodlab.com/wp-content/uploads/2010/09/P1020954-1.jpg)
Floors, 7 Holyoke
We’re working on the floors now at the new restaurant. We made the decision to re-use the existing floor which we’re really excited about. For
We’re working on the floors now at the new restaurant. We made the decision to re-use the existing floor which we’re really excited about. For
The pipes have been re-located and insulated at 7 Holyoke. These were those hot water/ cold water/ glycol pipes that ran right smack through the