Posts tagged harvard

From the archives

Floors, 7 Holyoke

30 September, 2010: We’re working on the floors now at the new restaurant. We made the decision to re-use the existing floor which we’re really excited about. For one, it saves us a bunch of money that we can re-allocate to do other great stuff. Second, it uses less material, which is great from an environmental perspective. Finally, we couldn’t… Read More

From the archives

Pipes insulated at 7 Holyoke

27 September, 2010: The pipes have been re-located and insulated at 7 Holyoke. These were those hot water/ cold water/ glycol pipes that ran right smack through the middle of the space. We’ve been waiting for this for a long time and are excited to see it in place. Can’t say we were thrilled these are in the space in… Read More